Davis EV Installations
Solano County

EV charger installation in Dixon.

Dixon's the western edge of our service area, a Solano County agricultural town with rapid residential growth on the east side. Valley Glen, Parkway Estates, and the newer subdivisions off Pitt School Road are 200A clean: standard 4 to 6 hour Wall Connector installs. The older downtown grid (West A Street, Maple, Mayes, built 1920s to 1970s) runs heavily 100A and 125A: load management saves $2,000 to 4,000 versus a service upgrade. Dixon's commuter mix (Davis, Sac, Vacaville, Bay Area) drives strong dual-EV adoption. Solano County permits are reliable; the local network installer knows the Dixon city building department by name.

Most-installed in Dixon
Local specifics in Dixon
Permit authority
City of Dixon Building Department, Solano County. The local network installer works with the Dixon building department directly.
Electric utility
PG&E. Dixon is PG&E territory, so PG&E EV rates and rebate programs apply.
Typical panels
200A in Valley Glen, Parkway Estates, and the newer subdivisions off Pitt School Road. The older downtown grid runs heavily 100A and 125A.
Rebates worth checking
The PG&E residential charger rebate and the federal 30C tax credit.

Free panel check in Dixon.

15-minute phone or 30-minute on-site. The matched network installer tells you exactly which install fits your home.